Dry-Year Yield Well Project

Ontario, CA 2010

The Dry-Year Yield Wells Water Treatment Plant project was completed in March 2010, with a total value of construction of $7,885,110. This project includes the construction of 2 well sites, block building, pipeline work, paving, sodium hypochloride generation system, ion generation system, ion exchange system, electrical works and painting.  

City of Ontario | Carollo Engineers

Read more

Alhambra Groundwater Treatment Plant

Alhambra, CA 2008

The Alhambra Groundwater Treatment Plant project was completed in September 2008, with a total value of construction of $9,010,045. This project includes the construction of an ion exchange system, GAC filters, backwash tanks, chemical feed, filter bags, pump station, metal building, pipeline, paving, fencing, site walls and electrical works.

City of Alhambra | Civiltech

Read more

Brinton Reservoir

Banning, CA 2010

The Brinton Reservoir was completed in May 2010, and has a total value of construction of $10,458,265. The project consists of the construction of an 8 million gallon concrete tank, earthworks, blockwall, paving, site piping, retaining wall, landscaping, electrical work and fencing.   

City of Banning | AECOM

Read more

Crafton Hills and Citrus Pump Stations

Mentone, CA 2014 The Crafton Hills and Citrus Pump Stations project has a total value of construction worth $27 million. This project includes a new 3.0-million-gallon concrete reservoir, pipelines with up to 66” diameter, electrical work, paving, earthwork and shoring.

CA Department of Water Resources | Vali Cooper & Associates Inc.

Read more

Milliken 1010-2B Reservoir

Ontario, CA 2008

The Milliken 1010-2B Reservoir Project was completed in February 2008, and the total value of construction of this project is worth $8,547,851. This project includes the installation of a 9 million gallon above-grade prestressed concrete reservoir, valve vaults, architectural façade, 24” and 16” pipeline, k-rails, grading, landscaping and paving.

City of Ontario | Tetra Tech

Read more

Hidden Hills Reservoir

Yorba Linda, CA 2010

Completed in July 2010, the Hidden Hills Reservoir project has a total value of construction worth $5,040,865. This project includes the construction of a 2-million-gallon concrete tank, modification of existing pump station, pipeline work, AC paving, electrical work and landscaping.

Yorba Linda Water District | Butier Engineering

Read more