Construction of the Vista Verde Reservoir Replacement Project – Phase II, including two 1 MG Type I pre-stressed concrete reservoirs, valve structure, interconnecting piping, mass grading, paving, site improvements, landscaping, electrical, instrumentation, demolition of the existing Vista Verde Reservoir, salvage of the temporary bolted steel tank, and incidentals for a complete and usable facility.