Replacement (demolition) of an existing water pumping station with a new 15 MGD pumping station (expandable to approximately 20 MGD), including replacement of the existing pump station intake. Install electrical equipment including vertical turbine pumps, VFDs, surge arrester system, MCC, lighting, HVAC, security intrusion and power for new Algaecide chemical system. Site paving and improvements.